Antônio Augusto Correia Galvão

All the explanations regarding the modular system that determined the structural conception freeing the typical floor for any variations in the Hildebrando de Almeida Prado building are valid for this Project. However, here the transition system is not double, resulting in a variation in the architectural expression on the ground floor. There is also a difference in the shape of the pillars, and in the solution for the wooden louvers.

specifications

  • Area: 10.220,00m²
  • Location: Av. Paulista x R. Ministro Rocha Azevedo − São Paulo.
  • Contractor: Conde Bonneval e Outros.
  • year: 1964